热门标签

新2最新登录址:Cahya Mata Sarawak to double cement capacity

时间:1个月前   阅读:22   评论:4

欧博网址:(www.aLLbet8.vip),欧博网址开放会员注册、代理开户、电脑客户端下载、苹果安卓下载等业务。

“The group is also talking to certain parties about joint ventures and partnerships in Indonesia,” sources told StarBiz, adding that CMS has contacted Bintulu Port Holdings Bhd on the port’s ability to handle the extra capacity.

KUALA LUMPUR: Cahya Mata Sarawak Bhd (CMS) is looking at doubling its current cement division’s production at the Bintulu grinding plant, according to sources, as the conglomerate plans to ride on the construction of Indonesia’s new capital Nusantara.

The Bintulu grinding plant in Sarawak has an annual production capacity of 750,000 tonnes.

“The group is also talking to certain parties about joint ventures and partnerships in Indonesia,” sources told StarBiz, adding that CMS has contacted Bintulu Port Holdings Bhd on the port’s ability to handle the extra capacity.

Indonesia President Joko Widodo had said early construction of Nusantara is underway, signalling some progress in the US$32bil (RM142.34bil) project, according to a Reuters report in June.

The mega project would see Indonesia move its capital from Jakarta to an underdeveloped area on Borneo island.

Based on its annual report last year, the conglomerate’s core businesses included cement, construction materials and trading, construction, road maintenance and property development as well as strategic investments which centred on export-oriented industries within the Sarawak Corridor of Renewable Energy and also the telecommunications industry.

,

新2最新登录址www.zq18.vip)实时更新发布最新最快最有效的新2最新登录网址,包括新2最新登录手机网址,新2最新登录备用网址,皇冠新2最新登录网址,新2最新登录足球网址,新2最新登录网址大全。

,

The group’s cement division encompassed CMS Cement Sdn Bhd, CMS Cement Industries Sdn Bhd and CMS Concrete Products Sdn Bhd and it is Sarawak’s sole cement and clinker manufacturer.

The cement plants are the Mambong integrated plant, and grinding plants in Pending and Bintulu and their combined annual production capacity for cement is 2.75 million tonnes.

Sources also said CMS was also looking at riding on the increasing demand for phosphate products, via its stake in subsidiary Malaysian Phosphate Additives (Sarawak) Sdn Bhd (MPAS) which is the first integrated phosphate complex in Malaysia. It is located opposite the Samalaju Port in Samalaju Industrial Park.

The first phase will feature three plants namely the yellow phosphorus, technical phosphoric acid and food grade phosphoric acid plants with an annual capacity of 48,000, 75,000 and 60,000 tonnes respectively.

According to CMS, the commissioning of the MPAS complex had been delayed throughout 2021 due to the commissioning issues, pandemic, unavailability of foreign workers and supply chain disruptions.

The integrated phosphate complex was due to see commissioning and trial operations of its furnaces by mid-2022, and it will produce a range of phosphate products including food, animal feed and fertiliser phosphates as well as ammonia and coke.

上一篇:tội có bạc online(www.84vng.com)

下一篇:足彩app(www.hg108.vip):【理响中国】从这部电影看新时代民族工作高质量发展

网友评论

  • 2022-08-10 00:20:31

    猎球者www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。猎球者上足球分析专家数据更新最快。猎球者开放皇冠官方会员注册、皇冠官方代理开户等业务。
    有艺术气息的写法

  • 2022-10-04 00:12:15

    “This is because legislators (MPs) have successfully passed approximately 40 Bills, including several important laws, three Federal Constitution amendment bills, including to restore relations within a Federal state and many act amendments,” he said.水一水,好看